Edged Energy · ORD01

2815 Bilter Road Building 1

Aurora, IL

United States

A new data center is under construction by Edged Energy. The total building size is expected to finish out at 210,000 SF, but only a portion of that will be used as critical space for servers. Design plans for the facility feature N+1 UPS redundancy.

Contact Edged Energy

Current status and power pipeline

Commissioned

This facility has been commissioned.

Planned

There are plans to add additional leaseable power.

Proximity to key digital infrastructure

location icon
location icon
location icon
location icon
1 mi

Location details

  • Building
  • Connectivity
  • Infrastructure
  • Compliance
  • Services
  • Security
Building
Year Built
2024
Purpose Built or Retrofit
Purpose Built
Building Size
210,000 SF
Building Owner
dashed
Power
On Site Substation
Planned
Single or Dual Feed
Dual Feed
Market Avg Power Cost
6.11
Power Provider
ComEd